GRID FREQUENCY
49.99 hz

CURRENT DEVIATION RATE
2.20 Rs./KWh

STATE DEMAND MET
4516.12 MW

STATE GENERATION
3608.39 MW

NET TIE FLOW
-1210.06 MW

Last updated on 18-01-2017
at 05:29 pm
Revision of Schedule currently in force


Revision 8
Installed Generation Capacity of the State
THERMAL
Constituent Power Plant Installed Capacity in MW
WBPDCL BTPS 4X60+210=450
STPS 2X250=500
KTPS 6X210=1260
BkTPP 5X210=1050
SgTPP 2X300=600
CESC BUDGE BUDGE 3X250=750
TITAGARH 4X60=240
SOUTHERN GENERATING STATION 2X67.5
NEW COSSIPORE 100
DPL DPL
HEL HEL 2X300=600
 
HYDEL
Constituent Power Plant Installed Capacity in MW
WBSEDCL PPSP 4X225=900
RAMMUM 4X12.75=51
TCF 9X7.5=64.5
JALDHAKA 2X4+4X9=44
NHPC TLDP PHASE-III 4X33=132
 
OTHERS
Constituent Power Plant Installed Capacity in MW
TPCL TPCL 2X45+1X30=120
CPL CPL 40
PCBL PCBL 30
SIIPL SIIPL 5